Following the award of a £60000 grant from the Marches Energy Fund, The Parish Council has undertaken the following work
The Pavilion Draycott
The removal of the gas boiler, replacing with an air source heat pump, fitting a 12.4kw solar array along with battery storage
Hollinswood Neighbourhood Centre
The removal of the 2 gas boilers, replacing with air source heat pumps.
Randlay Community Centre
The removal of the gas boiler and replacing all heating with either electric oil radiators or air heating and cooling systems,
