


On the 28th March 2025, the solar panels on the centre were fully commissioned.
27 panels have been installed in total, with a projected annual production on around 7mwh.
Please click this link to see how the panels are performing in real time:- The Pavilion Solar
This installation has been made possible by the Parish Council investing in its Zero ’30 goal with the support of The Marches Energy Fund.
This installation also included a battery storage facility which can store a maximum of 14kws along with an air source heat pump system.
